Murat Tuna, MSCE, pe

Murat Tuna, MSCE, peMurat Tuna, MSCE, peMurat Tuna, MSCE, pe

Murat Tuna, MSCE, pe

Murat Tuna, MSCE, peMurat Tuna, MSCE, peMurat Tuna, MSCE, pe

About Me

I am a Water Resources Engineer with over 9 years of hydraulic modeling and analysis, stormwater management features, hydrodynamic simulation of river flow, erosion, and sediment management in the water resources management field. 

My experience

- Pennsylvania DOT District 10-0, SR 2023-53 Bridge Replacement over Elk Run, McCalmont Township, Jefferson County, PA

Prepared Erosion and Sediment Control Plan for the project.  Completed a Hydrologic and Hydraulic Study for the project and prepared report for District reporting findings.   

- Pennsylvania DOT District 10-0, SR 2009-352 Bridge Replacement over Cherry Run, Toby Township, Clarion County, PA

Prepared Erosion and Sediment Control Plan for the project.  Completed a Hydrologic and Hydraulic Study for the project and prepared report for District reporting findings.   

- Pennsylvania DOT District 10-0, SR 3031-551 Bridge Replacement over Lick Run, Oliver Township, Jefferson County, PA

Prepared Erosion and Sediment Control Plan for the project.  Completed a Hydrologic and Hydraulic Study for the project and prepared report for District reporting findings.   

- Pennsylvania DOT District 10-0, SR 286-465 Bridge Replacement over Cherry Run, White Township, Indiana County, PA

Prepared Erosion and Sediment Control Plan for the project.  Completed a Hydrologic and Hydraulic Study for the project and prepared report for District reporting findings.   

- Pennsylvania DOT District 12-0, SR 356, Section D10 Bridge Replacement and Intersection Improvement Project, Allegheny Township, Westmoreland County, PA

Prepared NPDES permit document.  Completed drainage design for roadway system.  Completed Roadway Drainage Design Report for the Project .

- Pennsylvania DOT District 9-0, T-529 (Miller Road-Jackson Township Bridge No. 5) Over Laurel Run Bridge Replacement Project

Prepared Erosion and Sediment control Plan for project.  Completed drainage design for the proposed project and prepared associated drainage report. Prepared Hydrologic and Hydraulic study report.

- Pennsylvania Turnpike Commission, Mon/Fayette Transportation Project, PA Route 51 to I-376, Section 53B2, West Mifflin Township, Allegheny County, PA

Prepared of Hydraulic and Hydrologic analysis for culvert under mainline of proposed toll road.  Prepared NPDES application materials such as Erosion and sediment control plans for the project, Post Construction Management plans for the project, and Drainage system plans.  Performed various design duties in the completion of design of the proposed roadway drainage system design.  Prepared Environmental impact documentation to accompany the Waterway Encroachment 404/105 permit for the proposed toll road project.

- Massachusetts DOT, West Oxbow Road Bridge Replacement over Wilder Brook, Charlemont, MA

Prepared roadway design and layout. Project entailed structure replacement and roadway approach work.

- Massachusetts DOT, Ashland Bridge Replacement, A-14-006, Cordaville Road over Sudbury River, Ashland, MA

Prepared a Hydrologic and Hydraulic Study for the project and prepared report for MassDOT reporting findings.   

- Massachusetts DOT, I-90 Median Construction, Resurfacing, and Safety Improvements, Southborough, MA

Prepared BTC design for roadway design and layout. Project entailed structure replacement and roadway approach work.  

- Massachusetts DOT, New Bedford Viaduct Bridge Replacement Project, New Bedford, Bristol County, MA

Prepared BTC Design for separated storm water system for the New Bedford Viaduct bridge including pipe conveyance system and associated Best Management practices.  Prepared report with suggested preliminary design for the system.

- Massachusetts DOT, Route 16 Safety Improvements, Milford,MA

Prepared 25% Design for separated storm water system for the New Bedford Viaduct bridge including pipe conveyance system and associated Best Management practices.  Prepared report with suggested preliminary design for the system.

- Connecticut DOT, Bridge No 05115, Upland Road over East Aspetuck River, New Milford, CT

Prepared drainage design report for a bridge replacement project of an existing structure and associated approaches.  Prepared Permit Plan set for the project.

- Connecticut DOT, Bridge No 06141 Strawberry Road Over Abbey Brook, Ellington, CT

Prepared drainage design report for a bridge replacement project of an existing structure and associated approaches.  Prepared Permit Plan set for the project.

- Connecticut DOT, Bridge No 04583 Bunker Hill Road Over Hop River, Andover, CT

Prepared drainage design report for a bridge replacement project of an existing structure and associated approaches.  Prepared Permit Plan set for the project.

- Virgin Islands Water and Power Authority, Cruz Bay Underground Power, St. John, U.S. Virgin Islands

Performing design services and prepared construction documents including plans and specifications for this underground power project. The project included the relocation of all overhead power within Cruz Bay to underground ducts and relocating transformers from overhead to pad mounted to provide a more resilient electrical system for St John.  

CONNECT

Copyright © 2024 Murat Tuna - All Rights Reserved.

Powered by GoDaddy Website Builder

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept