I am a Water Resources Engineer with over 9 years of hydraulic modeling and analysis, stormwater management features, hydrodynamic simulation of river flow, erosion, and sediment management in the water resources management field.
Prepared Erosion and Sediment Control Plan for the project. Completed a Hydrologic and Hydraulic Study for the project and prepared report for District reporting findings.
Prepared Erosion and Sediment Control Plan for the project. Completed a Hydrologic and Hydraulic Study for the project and prepared report for District reporting findings.
Prepared Erosion and Sediment Control Plan for the project. Completed a Hydrologic and Hydraulic Study for the project and prepared report for District reporting findings.
Prepared Erosion and Sediment Control Plan for the project. Completed a Hydrologic and Hydraulic Study for the project and prepared report for District reporting findings.
Prepared NPDES permit document. Completed drainage design for roadway system. Completed Roadway Drainage Design Report for the Project .
Prepared Erosion and Sediment control Plan for project. Completed drainage design for the proposed project and prepared associated drainage report. Prepared Hydrologic and Hydraulic study report.
Prepared of Hydraulic and Hydrologic analysis for culvert under mainline of proposed toll road. Prepared NPDES application materials such as Erosion and sediment control plans for the project, Post Construction Management plans for the project, and Drainage system plans. Performed various design duties in the completion of design of the proposed roadway drainage system design. Prepared Environmental impact documentation to accompany the Waterway Encroachment 404/105 permit for the proposed toll road project.
Prepared roadway design and layout. Project entailed structure replacement and roadway approach work.
Prepared a Hydrologic and Hydraulic Study for the project and prepared report for MassDOT reporting findings.
Prepared BTC design for roadway design and layout. Project entailed structure replacement and roadway approach work.
Prepared BTC Design for separated storm water system for the New Bedford Viaduct bridge including pipe conveyance system and associated Best Management practices. Prepared report with suggested preliminary design for the system.
Prepared 25% Design for separated storm water system for the New Bedford Viaduct bridge including pipe conveyance system and associated Best Management practices. Prepared report with suggested preliminary design for the system.
Prepared drainage design report for a bridge replacement project of an existing structure and associated approaches. Prepared Permit Plan set for the project.
Prepared drainage design report for a bridge replacement project of an existing structure and associated approaches. Prepared Permit Plan set for the project.
Prepared drainage design report for a bridge replacement project of an existing structure and associated approaches. Prepared Permit Plan set for the project.
Performing design services and prepared construction documents including plans and specifications for this underground power project. The project included the relocation of all overhead power within Cruz Bay to underground ducts and relocating transformers from overhead to pad mounted to provide a more resilient electrical system for St John.
Copyright © 2024 Murat Tuna - All Rights Reserved.
Powered by GoDaddy Website Builder
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.